
North Queensland
Clay that opens in the dry, and a cyclone season that asks about the empty shell
Stock held for Townsville is matched to the length and the grade, and the delivery is quoted to the block. Cracking clay opens in the dry and swells in the wet, so a shell that sat level in September can rock on three corners by March.
- Where it is loaded
- North Queensland allocation, matched to grade and length
- What sets the day
- The unit that fits, then the weather on your block
- Usual truck
- Tilt bed for a 10ft or 20ft; side loader for a 40ft in the industrial estates; crane over an obstruction

Wind
An empty shell is lighter than it looks
Before cyclone season, think about restraint and about where the box sits relative to the house and the neighbour. A severe wind can move an empty unit. A full one is harder to shift, and you should not rely on it staying full. Do the tie-down work while the ground is still hard.

Clay
Baked hard is not a permanent level
The clay looks like concrete in the dry. It swells shut in the wet and the corners move at different rates. Bearers or pads under each casting, checked in March, keep the doors working. Bushland Beach, Deeragun and Bohle are 4818. North Ward and South Townsville are 4810, tighter streets, short steep drives, power lower than in a new estate.

Inland
Burdekin cane, Charters Towers cattle
Ayr is 4807 and Home Hill 4806, cane and machinery with long entries. Charters Towers, 4820, is a proper inland run for cattle and fencing gear. Ingham is 4850, wetter cane to the north. Giru, 4809, is on the way into the Burdekin. Rural tracks toward Woodstock have the space town does not.

Seals
Dust and salt, same hinges
Look at the door gear before the shell is reserved if it will be opened every day in dust, or parked near the water. A pretty side wall is not the inspection. Chemical and fertiliser on a Burdekin block want vents and whatever the product already requires. The box is a lockup.
Cyclone season, clay and seals
What is worth doing with an empty container before cyclone season?
Site it clear of the house and the neighbour, and tie it down while the ground is hard. An empty shell can move in a severe wind. Do not count on it staying full. Engineering advice belongs on a commercial site. We supply a straight frame. The anchor design is for your block.
The clay is baked hard. Will a container sit there happily?
Until the wet. It swells, and one corner often moves more than the others, so the doors bind by March. Pads or bearers, checked after the first real rain, are what keep it square. Dry crust is not a promise.
What sets the wait after an order goes in?
Which length and grade are free, then the weather on your track. A Burdekin headland and a town estate are not the same delay. The build-up can pause a day that the shell itself was ready for.
Get a price
Town, Burdekin, or inland toward Charters Towers?
North Ward, Ayr or a rural track. Say if cyclone tie-downs are part of the job.
Rather talk? Call us on 0477 410 500, Mon–Fri 7:30am–5pm, Sat 8am–12pm